achieve the objective. In order to Although each project is unique,
they all have the same life-cycle.
achieve the project objective, Through the subdivision of life-cycle, it
can be defined what dynamic
enterprises need to focus on the responsibility roles stakeholders need
take, so as to control the project
management of business processes, implementation process more
accurately. Before a problem or risk
organizational structure and happens, stakeholders can use the
process to prevent the possible risks
performance management instead of and to clarify their respective
responsibilities. After a problem or risk
static functional management. happened, stakeholders can rely on
the process to improve the efficiency
Enterprises should transform the system of finding out the problem and
investigate the corresponding
that resources belonging to responsibility of stakeholders, and
make sure that the entire life-cycle
departments into the system that management process from planning
to results is transparent. Construction
project roles can be dynamically and control of the process are
important symbols of project
dispatched, and build a platform to management maturity level (Yang
Qifang, Bai Sijun, Ma Guangping,
coordinate different stakeholders to 2009).
perform their dynamic role 3.2.2 Organization mode
based on all stakeholders
responsibilities. These changes enable
In many enterprises, the
enterprises to focus on the management units of "Department of
the system" are post and department,
implementation of project objectives, and the system is popular among
enterprises. The "Department of the
and dispatch the enterprise resources system" is actually based on a
relatively static environment and
effectively. Enterprises need to use the organization. The superior has the
power to assign the tasks, determines
process to define the responsibility the sequence of works, and set the
time limit for subordinates’ works.
relationships between all the Subordinates are regarded as
superiors’ resources, and superiors can
stakeholders in the project, so that occupy the resources and control
them in the work at least. Most of the
each stakeholder can assume their existing researches on the project
own governance responsibilities and 35
obligations. Meanwhile, enterprises
need to establish project performance
evaluation method based on project
objective, so as to provide the driving
force for departments’ roles changing.
3.2.1 Process based on
project life-cycle
Successful projects require a
number of stakeholders to take
responsibility jointly. However, this way
is easy to cause no one to take
responsibility. To solve the
contradiction, stakeholders need to
determine the types of roles and
responsibilities in the process, and
need to clear the interface and
relationships between these
responsibilities.