IPMA ITALY Journal of Applied Project Management
                                                            Volume 1 no. 3 (October 2015)

achieve the objective. In order to              Although each project is unique,
                                           they all have the same life-cycle.
achieve the project objective,             Through the subdivision of life-cycle, it
                                           can be defined what dynamic
enterprises need to focus on the           responsibility roles stakeholders need
                                           take, so as to control the project
management of business processes,          implementation process more
                                           accurately. Before a problem or risk
organizational     structure  and          happens, stakeholders can use the
                                           process to prevent the possible risks
performance management instead of          and to clarify their respective
                                           responsibilities. After a problem or risk
static functional management.              happened, stakeholders can rely on
                                           the process to improve the efficiency
Enterprises should transform the system    of finding out the problem and
                                           investigate the corresponding
that resources belonging to                responsibility of stakeholders, and
                                           make sure that the entire life-cycle
departments into the system that           management process from planning
                                           to results is transparent. Construction
project roles can be dynamically           and control of the process are
                                           important symbols of project
dispatched, and build a platform to        management maturity level (Yang
                                           Qifang, Bai Sijun, Ma Guangping,
coordinate different stakeholders to       2009).

perform their dynamic role                     3.2.2 Organization mode
                                           based on all stakeholders
responsibilities. These changes enable
                                                In many enterprises, the
enterprises to focus on the                management units of "Department of
                                           the system" are post and department,
implementation of project objectives,      and the system is popular among
                                           enterprises. The "Department of the
and dispatch the enterprise resources      system" is actually based on a
                                           relatively static environment and
effectively. Enterprises need to use the   organization. The superior has the
                                           power to assign the tasks, determines
process to define the responsibility       the sequence of works, and set the
                                           time limit for subordinates’ works.
relationships between all the              Subordinates are regarded as
                                           superiors’ resources, and superiors can
stakeholders in the project, so that       occupy the resources and control
                                           them in the work at least. Most of the
each stakeholder can assume their          existing researches on the project

own governance responsibilities and                                                             35

obligations. Meanwhile, enterprises

need to establish project performance

evaluation method based on project

objective, so as to provide the driving

force for departments’ roles changing.

    3.2.1 Process based on
project life-cycle

Successful projects require a

number of stakeholders to take

responsibility jointly. However, this way

is easy to cause no one to take

responsibility. To solve the

contradiction, stakeholders need to

determine the types of roles and

responsibilities in the process, and

need to clear the interface and

relationships      between    these

responsibilities.